Projects

Metropolitan St. Louis Sewer District (MSD)

Metropolitan St. Louis Sewer District (MSD)

St. Louis, Missouri
United States
Metropolitan St. Louis Sewer District (MSD)

Our team provided electrical engineering services for Metropolitan St. Louis Sewer District’s treatment plants in St. Louis, Missouri.

We provided electrical engineering services for short circuit, coordination, and arc flash studies on MSD’s treatment plants. Our team completed field investigations and confirmed all the existing electrical data and then executed the analysis utilizing SKM software. 

Upon completion of the studies, arc flash labels in conformance to NFPA 70E requirements were produced and installed on all equipment outlined in the finished reports. Additionally, AutoCAD one-line diagram drawings were developed for each site.  Our team has completed to date a total of 8 power system studies as follows: 

  • Lemay Water Wastewater Treatment Plant: Phase 1, 2, and 3, Arc Flash Hazard Analysis Services 

  • Fenton Water Wastewater Treatment Plant: Arc Flash Hazard Analysis Service 

  • Lower Meramec Water Wastewater Treatment Plant: Power Systems Study 

  • Grand Glaize Water Wastewater Treatment Plant: Power System Study 

  • Bissell Water Wastewater Treatment Plant: Sludge Building Power System Study 

  • Missouri River Water Wastewater Treatment Plant: Phase 1, Power Systems Study 

  • Missouri River Water Wastewater Treatment Plant: Review of Bonding, Grounding & Testing Study Cold Water Treatment Plant, Power Systems Study 

Services

Related Projects