Search
Project
Canada
The Stack at 1133 Melville Street – named for its unique, stacked-box design – was the tallest office tower in downtown Vancouver upon its completion in 2020. Project owners Oxford Properties Group
Project
Canada
Introba (formerly Integral Group) provided mechanical design and sustainability services to this dramatic urban village mixed-use development. The development will consist of three podiums and a 500
Project
Canada
Introba (formerly Integral Group) provided mechanical engineering services for this $38 million, 93,000 ft² building at Vancouver International Airport (YVR) in Richmond, British Columbia. The team
Project
Canada
Introba (formerly Integral Group) is providing LEED fundamental and enhanced commissioning services for the Viva Bus operations, maintenance, and storage facility in Richmond Hill, Ontario. Comprising
Project
United States
The new Watsonville Water Resources Center was first constructed in the 1920s and is now dedicated to protecting the Monterey Bay National Marine Sanctuary. The Center treats wastewater, provides
Project
Saudi Arabia
At 2,000 acres (800 hectares) and 30 million ft² total, PNU is the largest facility of its kind in the world, and symbolizes that education, creativity, and innovation are fundamental to building a
Project
Canada
This incentive program and juried competition incentivizes and supports high-rise residential, office, retail, commercial, institutional, and other large complex building projects designed to meet a
Project
Saudi Arabia
Integral Group is working with the Saudi Arabian National Guard Health Affairs and King Saud Bin Abdulaziz University (KSAU) to assist in the planning and design of three completely new health
Project
United Kingdom
Projects included transforming the back-of-house office space to a new prestigious gallery space in Sotheby’s listed building on New Bond Street, London. The brief for this £3.5-million scheme was to
Project
United States
From its fifteen maintenance yards, SEPTA supports 16 commuter railroad lines, a subway system, a light rail high-speed line, an elevated rail line, and 8 subway-surface trolley lines. In all, SEPTA
Project
Serbia
The development comprises of 20,000 m² of rental areas and 10,000 m² of underground parking space. Achieving increased indoor air quality and energy efficiency was one of the main goals of our
Project
Serbia
The project was developed through an architecture competition where renowned architects with domestic and international experience offered their visions of the “city within a city”. SOUL 64 seeks to
Project
Serbia
Due to the complexity of the building, this shell and core project will be built in two phases. Phase 1 consists of two building with a combined area of 30,000m2 with six floors. Primary use is
Project
United Kingdom
The Nottingham-based site was previously derelict for 26 years and is now being redeveloped into The Island Quarter, which will provide new homes, grade-A office space, a five-star hotel, retail units
Project
United States
Introba is providing Digital Advisory and Transformation Strategy consulting services to Thomas Jefferson University Health and their senior leadership in Facilities Management, Real Estate Design &
Project
United States
The 2nd Street Pavilion is a 530,000SF expansion at Hackensack University Medical Center. The new 11-story Pavilion will span over 2nd street and include a new grade level drop off and lobby. The new
Project
Australia
The environmental sustainability priorities facing governments and communities globally are brought into focus for this strategic urban renewal of Sydney Harbour. The principles of good place-making
Project
Australia
The development was modelled by our specialist sustainability group, achieving a 6 Star Green Star – Office As Built (v2) rating. The building has also performed exceptionally well in operation
Project
United States
The administration building is certified LEED Platinum and designed to Zero Net Energy. Multiple additional buildings on the campus have been Certified LEED Gold and Silver, and are Zero Net Energy
Project
United States
To meet the city’s target of carbon neutrality by 2050, the building stock will need to shift from fossil fuels towards efficient electric heat pumps. As heating systems are electrified, the electric